Advanced Performance Analysis and Troubleshooting for Power Plants

Event Start Date:
June 15, 2020
Event End Date:
June 19, 2020
Event Venue:
Buffalo, NY

This 4 1/2 day course is designed to teach attendees how to diagnose root causes of fossil and combined cycles power plant performance deficiencies. Over 25 different case studies are presented and solved, beginning with test data on specific components, followed by pertinent performance calculations, and ending with a “root cause” analysis of the problem. Diagnostic flowpaths, using “expert system” techniques, are provided for many of the case studies. The case studies are based on GP Strategies’ extensive experience in troubleshooting and testing all types of power plant equipment. Topics are optimally arranged to allow engineers from both plant types to pick and choose the equipment of most interest to them without any loss of continuity. Attendees have the option of attending the first 3 1/2 days on the Rankine cycle plant, the last 3 1/2 days on the combined cycle plant, or the full 4 1/2-day program.

You can register here.

General Technical Support

General Technical Support

Email: etaprosupport@gpstrategies.com
Main: 716-799-1077
Hours: 8:30AM - 5PM EST